IS IT TRUE June 4, 2012
IS IT TRUE Civic Center Moles tell the CCO that Vanderburgh County Recorder, Z Tuley will be challenged by an extremely well known Republican in the upcoming November 2012 General election? …that she should be ready to defend why she seems to take off from her job every summer?…that the other election issue that will be addressed is the lack of minority employees working in the Recorders office?
IS IT TRUE it is time to start a serious VETTING effort with respect to the Johnson Controls project that was shoved through by Mayor Weinzapfel during the final hours of his administration?…this particular project will supposedly replace every water meter in the area served by the City of Evansville?…the research to determine the accuracy of the existing water meters only took a few of the meters into consideration and even then determined that they were operating at nearly 99% accuracy?…the limited study assumed that all meters were inaccurate to the low side which is statistically impossible?…if the water meters that are in Evansville are already 99% accurate but 600 miles of cast iron pipes are in need of immediate replacement to the tune of $450 Million it is highly irresponsible to spend money on meters that are not needed and leave the obsolete pipes in service?…the commitment to spend $51 Million ($80 Million including interest) was made without a vote of the Evansville City Council?…the Johnson Controls project was snuck through in a convoluted way that makes the Earthcare Energy $200,000 loan advance look like giving pocket change to a hobo?
IS IT TRUE Mayor Winnecke and the Evansville City Council are faced with a choice that will define them either as a governance team that learned from a small mistake and corrected it OR as a team that gets rolled by every Tom, Dick, and Harry that waltzes through town with a silver tongued front man?…that the deal that Mayor Weinzapfel made with Johnson Controls without seeking City Council approval is 1,500% higher than the entire Earthcare Energy deal and a full 37,500% higher than the $200,000 at risk money already on the table due to non VETTING by five members of the City Council and GAGE?…Mayor Winnecke and the City Council need to hear the demands of the people of Evansville to actually get their college math books out and learn how to do some analysis before moving forward with the Johnson Controls deal?…if they can show definitive proof with sparkling results in other cities that this $80 Million investment will really save the City of Evansville enough to provide a respectable rate of return then they should move forward?…that the current contract ASSUMES 45% of the advertised savings and does not even pretend to test or verify that much of the amount?
IS IT TRUE that our Mayor and our City Council really need to think this through and their track record is not one of doing such things?…allowing this latest act in Weinzapfel’s last spending spree without securing proper VETTING and being transparent with the people of Evansville is simply not an acceptable way to govern?…that soon there will be two tempests in Mayor Winnecke’s teapot?…the Earthcare tempest was of his own making but the Johnson Controls tempest was slipped in by his partner in non-vetting Mayor Weinzapfel?…if Mayor Winnecke wants to redeem himself for the abject failure of the Earthcare Energy project that the Johnson Controls deal is a perfect opportunity to save Evansville $80 Million to make up for squandering at least $200,000?…we are quite curious to see if these old dogs can learn a new trick after 4 serial failures when it comes to VETTING?